Our completion petrochemicals are primarily used during the completion stage of oil or gas wells that are drilled in various shale formations in the United States. After a well is drilled, we deliver a specialized chemical equipment trailer, or chemical delivery unit, that is used in the pumping of chemicals during the hydraulic fracturing process. Hydraulic fracturing, or fracking, is a technology used to inject a fluid into a well to create fractures in the minerals containing the oil or gas. Usually the fluid is water, sand, and chemical additives. Our chemical delivery units pump chemicals to treat the fluids used in the completion of the oil and gas wells during the fracking process. Each unit consists of a trailer mounted pumping system with associated power generation components, a chemical supply trailer, safety and spill prevention equipment, communication devices, and computerized reporting equipment.

The units pump treatment chemicals to eliminate the bacteria contamination present in the fluids used in the fracking process. We have developed a specialized chemical formulation that is intended to provide for a longer-term bacteria-contamination elimination time frame. The longer-term time frame is designed to provide our customers significant cost savings in the removal treatment of contaminants from the oil and gas well-stream once the well has been placed into production.